S45 E9: Phased Out

The renovation has reached the halfway point. A lesson on stucco is given. The kitchen cabinet finish is revealed, the nickel gap siding is installed, and drainage for the back patio is addressed.

Unlock Exclusive Access

Enjoy ad-free streaming and exclusive extras!