S45 E13: Install with Care

The new mechanical room is revealed. In-wall lights are installed at the front ramp. Inside, an offset drain and grab bars are installed in the son’s bathroom. A glass-blowing studio is visited.

Unlock Exclusive Access

Enjoy ad-free streaming and exclusive extras!